YOU WILL NEED
One pair recommended needle size for the yarn you are using
Cable needle
ABBREVIATIONS
alt = alternate; k = knit; p = purl; rep = repeat; RSF = right side facing; st(s) = stitch(es)
SPECIAL ABBREVIATIONS
C2B = knit into back of second st on left hand needle, then knit first st, dropping both sts off the needle together
C2F = knit into front of second st on left hand needle, then knit first st, dropping both sts off the needle together
MB = make bobble: (K1, p1) twice into next st, turn work, k4, turn work, slip 2sts, k2tog, pass the slipped sts over
T5(4;3)L = slip next st onto a cable needle and hold at front of work, k4(3;2)sts from left hand needle, then k1 st from cable needle
T5(4;3)R = slip next 4(3;2)sts onto a cable needle and hold at back of work, k1 st from left hand needle, then k4(3;2)sts from cable needle
PATTERN INSTRUCTIONS
Multiple of 22sts + 13sts
1st row: RSF, k1, (T5R, MB, T5L, k5, p1, k5) to last 12sts, t5R, MB, T5L, k1.
2nd and every alt row: P6, (k1, p10) to last 7sts, k1, p6.
3rd row: K1, (k1, T4R, p1, T4L, k6, p1, k5) to last 12sts, k1, T4R, p1, T4L, k2.
5th row: K1, (k2, T3R, p1, T3L, k7, p1, k5) to last 12sts, k2, T3R, p1, T3L, k3.
7th row: K1, (k3, C2F, p1, C2B, k8, p1, k5) to last 12sts, k3, C2F, p1, C2B, k4.
9th row: K1, (k5, p1, k5, T5R, MB, T5L) to last 12sts, k5, p1, k6.
11th row: K1, (k5, p1, k6, T4R, p1, T4L, k1) to last 12sts, k5, p1, k6.
13th row: K1, (k5, p1, k7, T3R, p1, T3L, k2) to last 12sts, k5, p1, k6.
15th row: K1, (k5, p1, k8, C2F, p1, C2B, k3) to last 12sts, k5, p1, k6.
16th row: As 2nd row.
Rep these 16 rows.